Grafton Bridge – Loading and unloading of PCMS Barges

Wicks and Parker Cranes were hired to unload and load aluminium barges off semi trailers for the preliminary works of the new Grafton Bridge Project. Our 14 tonne Terex Franna and 20 tonne Terex Franna cranes were used to dual lift the barges off the back of the semi trailers and mobile down the boat ramp placing them into the water. Once work was completed Wicks and parker Cranes return to the site and reloaded the barges back onto the semi trailers. Pictures attached show Wicks and Parker’s Terex Franna Cranes in action

.