Contact 24 hours / 7 days: (02)6642­4138

Kyogle High School – Balustrade and Handrails

The job required travelling to site to take accurate measurements of existing concrete and block work for the hand rail and balustrade to follow. As you can see from the pictures, sections of the rendered block wall were curved and also changed in height which made it even more crucial to take exact radius measurements as well as overall length and differences in height. The next step was to fabricate balustrade and handrail sections back at our workshop. From there fabricated steel work was trucked to the galvanisers to be hot dip galvanised and then finally taken to site and installed. The job was completed successfully with a commendation given for the various sections of work done on site.

Steel fabrication in South Grafton

Recently Completed Projects

View More Projects