RECENT PROJECTS

Refurbishment Of 23 Metre
Structural Steel Fire Tower

Our 30 Tonne Tadano Slew crane was used to lower the tower to the ground and disassemble.

Once disassembled sections were loaded onto our 8-metre body truck and removed from site for refurbishment. The sections were then delivered back to site and erected once again.

 

Click to enlarge the photos on the right.